Bridge across the Vltava river near Kamýk


load-bearing structure: steel beam reinforced with trusswork; lower bridge deck
length: 111 m
weight of the steel structure: 187 t
investor: ŘSD (The Road and Motorway Directorate)
commissioning: 1999

The bridge received the award Bridge Structure of the Year 1999 in the Czech Republic.

Bridge across the Elbe river near Litol


load-bearing structure: composite beam, whose central span is stiffened with an arch; lower composite bridge deck
length: 201 m
weight of the steel structure: 857 t
investor: ŘSD (The Road and Motorway Directorate)
commissioning: 2001

The bridge received the award Bridge Structure of the Year 2001 in the CR.

Border Bridge on the D8 Motorway


load-bearing structure: composite steel concrete beam of box section; upper reinforced concrete bridge deck
délka NK: 411 m
hmotnost OK: 187 t
investor: ŘSD (The Road and Motorway Directorate)
uvedení do provozu: 2006

The bridge received the award Bridge Structure of the Year 2008 in the Czech Republic

Elevated roadway on Bělotín bypass


load-bearing structure: steel concrete composite beam with the upper reinforced concrete deck
length: 583 m
weight of the steel structure: 187 t
investor: ŘSD (The Road and Motorway Directorate)
commissioning: 2007

Bridge across the river Jizera near Kochánky


load-bearing structure: steel beam stiffened with an arch; lower composite bridge deck
length: 55 m
weight of the steel structure: 168 t
investor: Středočeský kraj (Central Bohemian Region)
commissioning: 2008

Bridge across the river Olše in Karviná


load-bearing structure: steel beam, whose central span is stiffened with an arch; lower composite bridge deck
lenght: 120 m
weight of the steel structure: 710 t
investor: ŘSD (The Road and Motorway Directorate)
commissioning: 2011

The bridge received the award Construction of the Year 2014 in South Moravian Region.

Bridge on the railway line Česká Třebová - Zábřeh na Moravě (Near Krasíkov)


load-bearing structure: composite continuous four beams (track system) and two beams (platform); upper bridge deck
length: 131 m
weight of the steel structure: 522 t
investor: České dráhy (Czech Railways)
commissioning: 2004

Bridge on the railway line Jaroměř -Trutnov (in Česká Skalice)


load-bearing structure: steel beam reinforced with trusswork; lower orthotropic bridge
length: 54 m
weight of the steel structure: 180 t
investor: ŘSD in the CR (The Road and Motorway Directorate)
commissioning: 2004

Bridge on the railway line Šatov-Znojmo


load-bearing structure: steel trussed structure coupled to the reinforced concrete bridge deck
lenght: 29 m
weight of the steel structure: 52 t
investor: SŽDC, s.o. (The Railway Infrastructure Administration)
commissioning: 2009

Bridge across the Olše river near Český Těšín


load-bearing structure: rigid beam stiffened with an arch
length: 63 m
weight of the steel structure: 580 t
investor: SŽDC, s.o. (The Railway Infrastructure Administration)
commissioning: 2010

Footbridge across the Brno Reservoir below Veveří Castle


load-bearing structure: solid-web steel arch with intermediate orthotropic bridge deck
length: 101 m
weight of the steel structure: 160 t
investor: Město Brno
commissioning: 2003

The footbridge obtained the award Structure of the Year 2003 in South Moravian Region and The Bridge of the Year 2003 in the Czech Republic.

Footbridge across Koliště st. in the IBC Zone

load-bearing structure: steel trussed space frame with intermediate bridge deck
length: 75+33 m
weight of the steel structure: 81 t
investor: Unistav, a.s.
commissioning: 1998