Reconstructions

Reconstruction


Bridge in Týn nad Vltavou


load-bearing structure: two steel trusses (simple spans) with lower composite steel-concrete bridge deck
length: 2 × 60 m
investor: the Town of Týn nad Vltavou
commissioning: 1998

Bridge on Hlučínská st. across the Odra river in Ostrava


load-bearing structure: two steel trussed arches in the main span, steel truss in adjacent spans, lower steel-concrete bridge deck
length: 92 m
investor: město Ostrava
commissioning: 2002