Footbridge across the Brno Reservoir below Veveří Castle
load-bearing structure: | solid-web steel arch with intermediate orthotropic bridge deck |
length: | 101 m |
weight of the steel structure: | 160 t |
investor: | Město Brno |
commissioning: | 2003 |
The footbridge obtained the award Structure of the Year 2003 in South Moravian Region and The Bridge of the Year 2003 in the Czech Republic.